Moura and Baralaba Fishways

Moura Weir and Neville Hewitt Weir Fishways Project

  • Undertaken in two phases, pre and post construction.
  • The pre-construction phase determined the migration requirements of fish within the system and how passage could be provided past the site.
  • The post construction phase assessed the successful operation of the fishway built to the design criteria set in the pre-construction phase of the project.
  • AFPS staff engaged by Fisheries Queensland were responsible for all aspects of funding, project management, experimental design, sampling and data collection, data analysis, report writing.